Taipei Park 廠辦租賃
Vertical Warehouses For Lease
Our Features
Functionality You Will Love
01
Eco-Friendly Design
We are using two large sizes of frequency convertible air conditioner motors to generate electric-efficient coolant storage tanks in the night time. The cost of the electricity bill in the night is 2.556 times than the day time. So, we are using the benefit of the night time to store 30 icy coolant tanks in the basement and using the energy to release and balance the AC to the building in the day time.
03
挫屈束制支撐 BRB
(buckling-restrained brace)
The method of constructing a BRB (Buckling-Restrained Brace) involves installing steel diagonal braces within the building. The steel diagonal brace (core component) is first laid with a layer of separation material, and then it is enclosed with a casing (confined steel tube). Concrete or mortar is then poured into the casing as filling material. BRBs can withstand tensile forces up to yield, and when under compressive forces, the core component wrapped by the confined steel tube and concrete can also prevent buckling, steadily developing yielding strength. Due to the symmetric behaviour of BRBs under tension and compression, with minimal differences in tensile and compressive strength, they can fully utilize the excellent ductility of steel components to absorb seismic energy. Additionally, BRBs have stable and predictable seismic performance, making it easy to design them as the structural fuse during the design process. In a properly designed BRB frame, during an earthquake, the nonlinear deformations of the lateral resistance system can be concentrated in the BRB energy dissipation segment. The presence of energy-dissipating braces results in smaller lateral displacements of the floors under strong seismic actions, effectively protecting the building and other structural components.
(National Experimental Research Center)
02
Excellent Building Management
We provide our building management with our client's demands.
04
Ground and roofing water recycle system. 雨水回收系統
Our building rain pipe system collects rainwater from the roofing to ground surface water and then carries it to our rain-reserved tanks in our building system. We use this system to water our plants.
Our
Locations
-
5 mins to MRT Nangong Exhibition Center Station
-
10 mins to Nangang High-Speed Rail station
-
15 mins drive to Neihu High Tech Park Area
-
25 min drive to Keelung Port.
Yonghe Taipei Industrial Park
Address: No.211, Nanyang St., Xizhi Dist., New Taipei City 221009, Taiwan (R.O.C.)